THE PRACTICE TEST
Practice test at a glance
- Questions
- 143
- Format
- Multiple choice
- Access
- 2 years
- Price
- $19.99
- Answers
- Included
- Explanations
- Included
GET FULL ACCESS
Unlock the full practice test
ONLINE ACCESS
Unlock all 143 practice questions, answers and explanations.
- Immediate access after payment
- One question at a time in practice mode
- Jump directly to any question
- One-time payment
We'll send your purchase information to this address.
Payment is processed by PayPal.
TRY IT FIRST
Sample practice questions
Try some of the questions before buying. Answers and explanations are available with online access.
Computers Elevators HVAC Recessed Lighting
Brownfield remediation Rainwater management Reducing parking footprint Reducing vehicle miles
Alternative Compliance paths Innovation credits MPR Regional priority credits
building owners that purchase building sub metering customers that enroll in a demand response program day lighting automation systems
fixtures cutsheeets of waterless urinals submetering of water-using systems the operating times of the building the schedules of occupants
during the discovery phase of water-related systems when calculating the minimum indoor air quality of a warehouse when determining the minimum energy performance of a two-story residential project when measuring the amount of rainfall on site
LEED certification agents authority certification agreement owners requirements
CFCs VOCs mercury radon
By a map showing the project site, location, type of transportation resources, and driving distances to each location By a map showing the project, project boundary, transit stop locations, walking routes, and distances to those stops By an area plan or map showing the project site and location of transit stop location within a 1/2 mile (800-meter) radius of the project site By an real plan or map showing the project, project boundary, transit stop locations, walking routes, and distance to local shops
A committee must review the request The inquiry must first undergo the project CIR process The project must earn a LEED certification The project team must contact USGBC
Diverting a large percentage of waste from the landfill Implementing an employee recycling plan Purchasing a product with a minimum amount of packaging Separating recyclables on site
Increasing the amount of turf grass Using drip irrigation Using only native plant material Xeriscaping
10 % 35% 65% 90%
Animal waste Natural gas Plant material Seaweed
Commingling is cheaper than separating on site Provides immediate feedback of diversion rates Takes up less space on the job site Uses one bin for all recycled materials
LEED for Core & Shell LEED for Homes LEED for Neighborhood Development LEED for New Construction and Major Renovations
To determine baseline energy usage To set baseline water flow requirements of water fixtures To set guidelines on VOC use To set guidelines on site selection
Commingled recycled content Postconsumer recycled content Preconsumer recycled content Rapidly renewable recycled content
A lake or stream Capture rainwater Municipal water systems The ocean
3 4 5 The credentialing system is composed of 5 types of LEED APs at the second tier: BD+C, ID+C, Homes ND, and O+M6
Data Centers Government facility Healthcare facilities Hospitality
How much refrigerant will be reclaimed Where the construction waste will be taken when it leaves the site Whether the construction waste will be comingled or sorted on-site Who the construction waste haulers will be
Community Energy and Atmosphere Human Health Sustainable Sites
Gallons per flush (gpf) Toilets and urinals are measured in gallons per flush (gpf) Sinks and showers are measured in gallons per minute (gpm)Gallons per minute (gpm) Gallons per use (gpu) Pounds per square inch (psi)
100 miles 150 miles 250 miles 500 miles
Green Rater Home Inspector Home Rater Project Manager
Lower product cost Lower transportation costs Materials can be commingled on-site Reduces the demand for virgin materials
LEED Reference Guide for Building Operations and Maintenance (O+M) LEED Reference Guide for Homes Design and Construction LEED Reference Guide for Interior Design and Construction (ID+C) LEED Reference Guide for LEED For Neighborhood Development
Duration Relative efficiency Water efficiency Water metering
0% 10% 15% 20%
Blackwater Graywater Potable Water Rain Water
An email from the architect to the town Small task groups Stakeholder meetings Team meetings
BIM (building in modeling) Energy modeling RFIs RFPs
Fire-suppression systems Heating systems Refrigeration systems Storm water
Landscape sprinkler heads Shower heads Toilets Urinals
Project cost Recycling requirements The amount of open space required The type of building that can be built in a given area
Extra cooling towers are required in a passive cooling system They are NOT considered environmentally friendly They are better suited for cooler climates They consume more energy than conventional cooling system
Global-warming potential (GWP) Landfill hazard analysis (LHA) Ozone depletion potential (ODP) Particulate count
Place half the parking underground Plant small trees that will shade the parking lot within 10 years Use mature trees to shade 50% of the parking lot Use paving with an SRI of 35
Energy and Atmosphere Indoor Environmental Quality Materials and Resources Water Efficiency Xeriscaping is a landscpaing method that utilizes drought-resistant plants that require little or no irrigation.
Integrative projects typically have less change orders during construction Integrative projects typically have less design challenges during the construction documents phase Integrative projects typically have more change orders during contraction Integrative projects typically have more design challenges during the construction documents phase
All of the above Enhance and protect ecosystems and biodiversity Improve air and water quality Reduce solid waste
LEED only allows the use of halons in HVAC systems The project would be eligible for an exemplary performance point under EAc 4, Enhanced Refrigerant Management The project would not be eligible for LEED certification Using halons in a fire suppression system would not disquality a project from LEED certification, as long as it is installed in accordance with local fire codes
A cost breakdown of the proposed strategy The intent of the proposed innovation credit The proposed requirement for compliance The proposed submittals to demonstrate compliance
All of the above Creates a healthy indoor environment Uses spaces, materials, and resources efficiently minimizes construction waste
A CIR may only be submitted AFTER the design review Limit CIR submission text to 600 words Request guidance on only one credit/prerequisite per CIR The option to submit a CIR expires upon the final award or denial of certification
chain of custody letter of custody proof of custody purchase order
Green Infrastructure and Buildings LEED for Neighborhood development has different categories than the other rating systems, including: Smart location & linkage, Neighborhood pattern and design, and green infrastructure and buildingsInnovation Smart Location and Linkage LEED for Neighborhood development has different categories than the other rating systems, including: Smart location & linkage, Neighborhood pattern and design, and green infrastructure and buildingsSustainable Sites
Adhesives, sealants, and sealant primers Anti-corrosive and anti-rust paints Carpet adhesives Clear wood finishes, floor coatings, stains, and shellacs
Commit to not installing any additional CDC-based refrigerant systems Commit to phasing out CFC-based refrigerants within 5 years Convert the chilled water system to CFC-free refrigerants by project completion Verify through testing that existing equipment does not leak the CFC-based refrigeratns
Increase the size of the parking lot Install pervious paving Install vegetated roofs Maintain natural stormwater flows by promoting infiltration
Ensure exterior lights comply with the light zone requirements defined in IESNA RP-33 Minimize the amount of interior lights (visible from the exterior) that operate at night Reduce the power input to interior lighting (visible from the exterior) at night Shine landscape lights straight up into the sky (not at an angle)
A site that was graded 10 years ago and is now grassland An abondoned factory site An existing parking lot downtown Farmland
20-30 40-49 50-59 60-69
A natural pond A wooded area The building itself Undisturbed landscaping
A successful CIR can award LEED points All projects must use CIRs CIRs can be submitted by anyone with a USGBC account CIRs costs $220 east
Achieving exemplary performance Achieving innovative performance Earning the credits deemed as Regional Priority credits by USGBC Satisfying all LEED prerequisites
LEED for Commercial Interios LEED for Homes LEED for Operations and Maintenance LEED for Schools
First costs, excluding the cost of installation First costs, including the cost of installation Maintenance and replacement costs, but not life expectancy Maintenance, life expectancy, and replacement cost
B.Commissioning of systems C.Develop a green vision D.Develop project schedule Site Selection
Architecture Biomimicry Biomimicry is the science of using nature to solve human problems by imitating life. Permaculture encompasses the concepts of ecological design and construction practices to embrace nature and not work against it.Farming Permaculture Biomimicry is the science of using nature to solve human problems by imitating life. Permaculture encompasses the concepts of ecological design and construction practices to embrace nature and not work against it.
LEED for Building Design and Construction LEED for Homes LEED for Interior Design and Construction LEED for Operations and Maintenance
Energy and Atmosphere Materials and Resources Sustainable Sites Water Efficiency
ASHRAE Standard 52.2-1999 ASHRAE Standard 55-2004 ASHRAE Standrad 90.1-2007 Green Seal Standard 36
The project's city The project's country The project's state The project's zip code
Capitalizing on credit synergies Meeting building codes Reducing project soft costs Shortening the project schedule
Ammonia Carbon Dioxide Freon Water
ASHRAE Standard 62.1-2004 American Council for an Energy Efficiency Economy (ACEEE) Commercial Buildings Energy Consumption Survey (CBECS) Energy Policy Act of 1992
A buiding's structural performance Energy optimization Solar panel performance Water infiltration
Leadership in Efficient and Effective Design Leadership in Energy Efficient Design Leadership in Energy and Environmental Design Leadership in Environmental and Energy Design
Blackwater Graywater Potable water Well water
All of the LEED rating systems are based on a 100 point scale Seven impact categories were defined with a climate change most heavily weighted Three association factors were used as a means to measure and scale each credit USGBC consulted with NIST and the U.S. EPA's TRACI tool to determine the credit weightings.
Placing parking underground Shading hardscape with photovoltaic panels Using asphalt for parking areas Using open grid paving
Goals can be qualitative but not quantitative Goals can be quantitative but not quantilative Goals should include metrics and targets Goals should reflect reasonable spatial scale and time horizons
100 105 Calculate peak building users by adding total FTE and transient occupants 100 employees @ 8 hours/day = 100 FTE 10 employee @ 4 hours/day = 5 FTE 1000 transient occupants (students) = 1000 (building users) 100 + 5 + 1000 = 1105 peak building users1100 1105 Calculate peak building users by adding total FTE and transient occupants 100 employees @ 8 hours/day = 100 FTE 10 employee @ 4 hours/day = 5 FTE 1000 transient occupants (students) = 1000 (building users) 100 + 5 + 1000 = 1105 peak building users
ASHRAE Forest Stewardship Council (FSC) The Forest Stewardship Counsil certifies wood that is harvested from environmentally sustainable forests.Lumberjack's Associate of America (LAA) U.S. Wood Institute (USWI)
Carpet adhesive Carpet substrates Interior Carpet Temporary rugs
LEED for Commercial Interiors LEED for Core & Shell LEED for Existing Buildings: Operations & Maintenance LEED for New Construction and Major Renovations
They are very inefficient at creating energy They create hazardous waste in the landfills They pollute nearby rivers and streams They release carbon dioxide Fossil fuels release carbon dioxide when burned. Carbon dioxide is a greenhouse gas.
American Council for an Energy-Efficient Economy Green Book California Air Resources Board ZEV Green Seal Standard The Greenguard Certification Program
All paints, coatings, and primers conform with GS-11 Erosion and Sedimentation Control (ESC) Plan for all construction activities Prohibit smoking inside the building Recycle bins
Amount of soil to be exported or imported Ceritifed wood materials to be used Materials to be diverted Whether materials will be sorted on-site or comingled
Contamination of landfills Greenhouse gas emissions Indoor CO2 levels Storm water contamination
Clarification of one existing LEED credit or prerequisite Definitive assurance that a particular method or strategy permitted on a previous project will be applicable to other projects in the future Determination of whether a particular strategy can be used to satisfy two different credits at once Responses to written requests to interpretation of credit requirements
Flood plain Greenfield Previously developed site Prime farmland
bamboo flooring cotton batt insulation linoleum flooring steel framing
Assume the CIR will be approved and submit it as part of the design review Credit language can't be changed through a CIR Minimum acheivement thresholds can't be changed through a CIR Review previously submitted CIRs to see if the same inquiry has been answered
Satify all prerequisites and earn 50 LEED credit points Satisfy all prerequisites Satisfy all prerequisites and earn 30 LEED credit points Satisfy all prerequisites and earn 40 LEED credit points
Commingling construction waste materials Modular construction Ordering materials cut to size Selecting products manufactured with recycled content
10,000 sf 15,000 sf 30,000 sf 90,000 (sf)/3 (levels) = 30,000 sf per level The building footprint is the size of the building at ground level45,000 sf
The built environment provides structure for human activity The built environment refers to animal-made shelters The built environment refers to any element in nature The built environment refers to any man-made environment
Carpet Furniture Paint Wood products
U.S. GBC U.S. Green Building Council U.S.G.B.C. US GBC
Economics of building systems during the life of the building Environmental benefits and potential impacts of a material, product, or technology It is important to remember that LCAs not only look at the present impacts and benefits during each phase of the process but future and potential impacts as wellEnvironmental impacts of materials during construction Social impacts of policies during fiscal year
ADA ANSI Civil Rights Act EPAct
Chlorofluorocarbons (CFCs) Hydrochlorofluorocarbons (HCFCs) Hydrofluorocarbons (HFCs) Natural Refrigerants
A letter template Some credits and prerequisites may also require additional supporting documentation, but all LEED credits and prerequisites require a LEED letter templatePhotos Project drawings Project narrative
Amperage Cost Kilowatts Voltage
Certification bodies are accredited to ISO standard 17021 Certification bodies are managed by GBCI and are assigned to a project team after registration, to assist with the process for a project seeking LEED certification, including the review of and response to CIRs, GBCI is responsible for the appeals processCertification bodies are assigned a project once a project is registered Certification bodies are managed by USGBC Certification bodies are responsible for the responding to appeals
Certification bodies GBCI GBCI (Green Building Certification Inc.) is responsible for the appeals processes well as managing the certification bodies. It is best to remember USGBC as an education provider for the LEED rating systems they create, and GBCI as being responsible for professional accreditation ad project certification processes.None of the above USGBC
1 10 20 5
20% 30% 40% 50%
LZ-1 Dark The LZ-1 Dark zone has the most stringestn requirement to comply with the MCSSc8, Light Pollution Reduction credit. The reason is to minimize additional imapct on the site. Rural sites should have less light pollution.LZ-2 Low LZ-3 Medium LZ-4 High
Energy and Atmosphere Indoor Environmental Quality Materials and Resources Water Efficiency
To establish baseline building energy performance To establish baseline building plumbing fixture performance To set indoor air quality requirements To set product VOC limits
A green roof An open grid pavement system Removing 100% of underground parking Shade produced from architectural devices or structures that have a solar reflectance index (SRI) of at least 29
Increasing impervious paving Installing a vegetated roof Minimizing building foorprint Using bio-retention
Find the right team and process Set lofty goals Goals should be clear and measurableStart the process early Understand the system across space and time
Brownfield sites allow for a faster construction schedule Substantially lower property cost Testing for contaminates is not necessary on a brownfield site The project would earn one LEED point for choosing a brownfield
A ground-up, new construction of school A renovation project focusing on walls, HVAC, and finishes within a 40,000 SF new addition A tenant improvement project within an existing commercial building LEED for Commercial Interiors is best suited for tenant spaces within office, retail, and institutional project types, specifically tenant spaces that do not occupy an entire building. LEED for commercial Interiors goes hand-in-hand with the LEED for Core & Shell rating systemAn existing hotel renovating their HVAC system
LEED for Commercial Interiors LEED for Core & Shell LEED for Homes LEED for New Construction
The project team can choose to register under any previously released version of LEED The version of LEED that is current at the time of project completion. The version of LEED that is current at the time of project registration The version of LEED that is current when construction begins
LEED for Commercial Interiors LEED for Core & Shell LEED for Existing Buildings: Operations & Maintenance (O+M) This is the best rating system for this project as it involves only HVAC replacement and no other renovations.LEED for New Construction and Major Renovations
Greenhouse gases Heat absorbed from the sun Heat produced by building mechanical systems Heat produced from vehicle engines
50 58 80 85
A material with a high SRI helps reduce heat island effect SRI is a measure of contaminants in the air SRI is an important factor when selecting carpet SRI is the measure of a material's ability to reject solar heat
Bio-fuel Hydroelectric Photovoltaic (PV) Wind
Classifed as a Zero Emission Vehicle by the California Air Resources Board Green Label score of 40 Green Seal score of 30 Green Seal score of 40
Gallons per flush (gpf) Gallons per hour (gph) Gallons per minute (gpm) Gallons per use (gpu)
"As a first step toward LEED Green Building certification, [organization] has registered this project with USGBC to achieve LEED certification" "This project is registered under LEED NC rating system" "Upon completion, this project will apply to become LEED certified" "Registered with the certification goal of Silver"
Energy and Atmosphere Indoor Environmental Quality Innovation in Design Water Efficiency
Cooling water Industrial water Mechanical water Process water
A strong facilitator needs to be flexible and have good listening skills Charrettes are an important part of the interactive process to ensure an integrative approach for green building projects. An agenda and stipulated goals are needed in order to produce specific deliverables. The facilitator has an extremely important role as his or her approach can dictate a charrette's success.An agenda and clear goals of the charrette are needed Charrettes are an important part of the interactive process to ensure an integrative approach for green building projects. An agenda and stipulated goals are needed in order to produce specific deliverables. The facilitator has an extremely important role as his or her approach can dictate a charrette's success.The charrette should only include the stakeholders and the architect The facilitator should be biased
Bronze Certified Gold Silver
Installing a roof with a low SRI value Installing open-grid paving Placing parking underground Planting tress that will shade hardscape areas
FCS GC-03 GS-11 GS-36
Embodied energy Life-cycle analysis Life-cycle costing TRUE energy
Certified Wood Rapidly Renewable Materials Recycled Materials Regional Materials
Limiting the amount of packaging materials on a product Selecting materials with a high recycled content Selecting regional materials Separating recyclables on site
False, administration buildings cannot be certified under LEED for New Construction False, the university would need to look at the LEED for Universities rating system True, the project team will need to determine which rating system is best suited to the project true, but only if the mechanical systems are on one loop
Energy and Atmosphere Materials and Resources Sustainable Site Water Efficiency
CBES EPA ISO 14021 Montreal Protocol
Increased Life-cycle costs Increased first costs Increased soft costs Reduced construction costs
Decreased development density Decreased number of greenfields Improved community relations Reduced energy costs
LEED for Core & Shell LEED for Homes LEED for New Construction LEED for Schools
Exemplary performance points are not awarded under any specific category, it will be added to the end of the LEED scorecard The exemplary performance point will be awarded as a Regional Priority point The exemplary performance point will be awarded as an Innovation in Design point. The exemplary performance point will be awarded under the credit in which exemplary performance is achieved
Carbon dioxide Carbon monoxide Ozone Radon
20% 25% 30% 40%
Energy consumptio Heat island effect Increased ventilation Indoor air quality
LEED for Commercial Interiors LEED for Homes LEED for New Construction LEED for Schools
One month One week One year You will have 1 year after you register and paid for the exam to schedule and sit for the LEED Green Associate examThree months
Bathroom Sink Kitchen Sink Shower Head Urinal
Architect General Contractor Interior Design Owner
Ready for all 143 questions?
Unlock the full practice test