1) The MR credit category focuses on minimizing the embodied impacts of building products throughout all phases of extraction, processing, transport, maintenance, and disposal. This is referred to as:
cradle-to-gate assessment
exemplary performance
life-cycle approach
single attribute optimization
2) What type of water cannot be used to reduce a building's usage of potable water?
Captured rainwater
Graywater
Groundwater
Non-potable water
3) The specification writer for a LEED BD+C: Core & Shell project is writing performance criteria for interior paints used in the shared common areas. Which of the following are important considerations when considering indoor environmental quality? (Select 2)
Color
Daylight Factor
Ease of cleaning
VOC Emissions
4) The Integrative Process credit should assess at least two potential strategies during the Discovery phase. The potential strategies include all of the following except:
Lighting Levels
Occupant Preference
Site conditions
Thermal Comfort Ranges
5) A vegetated garden roof is being considered for a building in a downtown environment. Which is NOT a benefit of having a garden roof?
Increases open space
Reduces heat island effect
Reduces stormwater runoff
Reduces water demand
6) Captured stormwater could be used to help with all the following EXCEPT:
Reducing a project's impact on the heat island effect
Reducing potable water demand for landscaping irrigation
Reducing potable water demand for sewage conveyance
Reducing the peak rate and quantity of stormwater runoff from a project site
7) What would help encourage the use of green vehicles? (select 2)
Designate parking spaces near the building entrance for green vehicles.
Encourage a car-share program.
Install parking meters.
Provide discounted parking for green vehicles.
8) Reducing the amount of light that leaves the project site at night time would result in: (select 2)
Increased energy consumption
Increased night time criminal activity
More visible stars
Safer migrations for birds
9) Products with trade secret ingredients must provide the following data to qualify as an eligible product under Building Product Disclosure and Optimization - Material Ingredients (select 2)
Contact information for suppliers
GreenScreen benchmark
Life cycle data of product
Role of ingredient in final product
10) Acoustic Performance requires project teams to address which of the following? (select 3)
Background Noise
Humidity Levels
Mechanical Equipment Noise
Startling Noises
11) Which one of the following best describes the parameter(s) to which ASHRAE Standard 62.1-2010 applies?
air volumes for building flush-out
environmental tobacco smoke
thermal comfort
ventilation and indoor air quality
12) Commissioning is the process of _______________ that a building's systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the owner's project requirements.
calibrating
the performance
verifying
verifying and documenting
13) Graywater is often used for
Dishwashers
Drinking
Irrigation
Swimming pools
14) Which of the following descriptions of construction waste best describe commingled materials?
assembled together with waste from nearby projects onsite
picked up by a third party and sorted off-site
re-used onsite
separated and sorted onsite
15) An acceptable substitute for preferred parking spaces for the Location and Transportation (LT) credit Green Vehicles is:
10% discounted parking rate
20% discounted parking rate
25% discounted parking rate
30% discounted parking rate
16) Which of the following potential site locations would qualify the project for Location and Transportation credit LEED® for Neighborhood Development Location?
A land parcel immediately adjacent to a LEED ND v4 Certified Project
A land parcel within a LEED ND v4 Certified Plan
A land parcel within a LEED ND v4 registered project
None of the above
17) Which of the following is true for Bicycle Storage for LEED?
All bike-commuters must have head-lights
Bike lanes must be provided starting 1 mile away
Schools have to provide a bike-share program
The number of bike racks required is partially based on peak users
18) Which of the following is true for projects using both electricity and natural gas energy inputs? (select 2)
Both gas and electric use must be considered when attempting Green Power.
Electric use must be higher than gas use, by cost, to qualify for Green Power
Gas use is not considered for Green Power.
The project must purchase green power, carbon offsets, or RECs to earn Green Power
19) If the project's existing structures included in the LEED project do not qualify for the building reuse, then the existing structure can contribute as which of the following:
Construction waste management
Materials reuse
Recycled content materials
Sustainably sourced
20) When submitting for an Innovation Credit, the design team must:
Document quantifiable environment and/or health benefits.
Submit a CIR before the Construction Phase submittal
Submit an appeal to GBCI
Video tape the implementation of the strategy
21) Which of the following areas would count against the project when assessing compliance with Views for LEED:
A janitor's office does not have access to views
A person has to look through interior glazing to see out a window
A person sits more than 30 feet from a window but has a direct line of sight
The sill of a clerestory window that runs along three sides of an office is located 10ft above the floor
22) For the MR credit Construction and Demolition Waste Management, diverted waste includes all of the following except:
donated materials
hazardous waste materials
reused materials
salvaged materials
23) Which of the following would help provide habitat to native wildlife? (select 3)
Allow occupants to bring pets to work.
Limit rainwater run-off.
Limit the area of construction disturbance around the building's footprint.
Replace invasive species with native plants.
24) Energy use data over time can assist in the identification of which following issues? (select 2)
Boiler malfunction
Rodent infestation
Solar panel failure
Water intrusion
25) Which of the following strategies would be considered on-site renewable energy sources (Select 3)
a wind farm located within 50 miles of the project and owned and operated by the local utility provider
active solar-thermal collectors as a means of heating service hot water
an on-site electric generator powered by geothermal energy
building-integrated photovoltaic solar panels that provide electricity to the building
26) Prior to qualifying as a LEED AP with a specialty in Neighborhood Development, a candidate must satisfy which of the following:
Completed 30 hours of continuing education in green building, with at least 6 hours in GBCI approved LEED-specific courses.
Documented experience on at least 1 project registered or certified in the LEED ND program.
Earn the LEED Green Associate credential.
Earn the LEED for Homes and LEED for Building Design and Construction specialty credentials.
27) A design team for a LEED BD+C: New Construction project has a mechanical engineer and an architect that are LEED Accredited Professionals with a BD+C specialty, and the structural engineer is a LEED AP with an O+M specialty, which would help contribute to:
One IN point
One Regional Priority
Three IN points
Two IN points
28) All of the following are examples of acceptable third-party verified corporate sustainability reports (CSR) for Raw Material Source and Extraction Reporting, EXCEPT:
Global Reporting Initiative (GRI) Sustainability Report
ISO 26000
REACH Optimization
U.N. Global Compact
29) Which of the following best describes when the LEED scorecard might be used?
While calculating daylight factor
While conducting a design charrette
While modeling a building's energy consumption
While punch-listing after construction
30) Providing occupants with access to daylight could...(select 3
Decrease energy demand of the building
Increase CO2 levels
Increase energy demand of the building
Increase productivity and happiness
31) All of the following should be considered during the Discovery phase except? (select 2)
Commissioning
Indoor water demand
Local recyclers
Thermal comfort ranges
32) A project's mechanical engineer has suggested that the ventilation rate be raised to 30% above the requirements of ASHRAE 62.1-2010. What impact will this have on the building?
Assist in meeting building flush out requirements
Improve building energy efficiency
Improve the building's indoor air quality
Reduce the building's thermal comfort
33) A project is planned for an urban site. Which of the following situations might qualify for Access to Quality Transit?
A bicycle path runs directly in front of the building.
A pedestrian can walk to 2 bus stops for the same bus line, both within ¼ walking distance
A pedestrian would have to cross a busy interstate to reach 2 bus lines that stop 1/4 of a mile away.
A pedestrian-accessible commuter train stop will be built 1/2 mile away, within 1 year of the project's completion.
34) The rating system that incorporates the issues of new urbanism and smart growth is:
LEED for Building Design and Construction
LEED for Homes
LEED for Neighborhood Development
LEED for Urban Renewal
35) Sustainable Forestry is the practice of managing forests to meet the long-term needs of humans while:
Maintaining competitive pricing with non-FSC-certified wood products.
Maintaining the biodiversity of forested landscapes.
Not removing more timber volume than what is replaced for the cutting intervals.
Saving endangered species trees
36) What is the key to the Integrative Process
Energy Modeling
Individual incentives
Project team collaboration
Tax incentives
37) Which of the following is NOT a recommended control measure by SMACNA Indoor Air Quality Guidelines?
HVAC Protection
Housekeeping
Scheduling
Sedimentation
38) Which one of the following elements are excluded from the calculations for construction waste management?
Elevators or transport devices
Furniture
Hazardous waste materials
Wood
39) Structural controls for erosion and sedimentation control: (Select 2)
Mulching
Retaining wall
Sediment traps
Silt fencing
40) Which of the following is a prerequisite in the Water Efficiency category for the LEED BD+C rating system?
Building-Level Water Metering
Cooling Tower Water Use Reduction
Nutrient Recovery
Rainwater Management
41) The following landscape factors must be used to quantify the water savings for water efficient landscaping (select 3)
Density Factor
Irrigation Factor
Microclimate Factor
Species Factor
42) Which of the following are benefits of Demand Response? (select 2)
It enables commissioning of the building energy systems
Projects can reduce their energy costs
Projects can reduce their labor costs
Reduced reliance on fossil fuels
43) The USGBC regional councils and chapter collaborated to determine the Regional Priority credit, in which credits were identified, based on:
EPA guidelines
Environmental importance for a project's region
Major environmental issues for the US
Water and energy conservation concerns
44) Water is periodically discharged from cooling towers as blowdown. Why is this necessary?
Blowdown is an optional process, used to increase efficiency
To prevent the formation of radioactive isotopes
To reduce concentrations of dissolved solids
To reduce formation of ice
45) Which of the following scenarios would comply with the Lighting Control option of EQ Credit Interior Lighting? (Select 2)
A bathroom with an occupancy sensor
A classroom with a dimmer switch on the wall by the door
A classroom with daylighting sensors
A conference room with bi-level switching
46) Which of the following is a false statement?
A company may become a member of National USGBC
An individual may become a member of National USGBC
LEED is created and maintained by USGBC
USGBC and GBCI are both non-profit organizations
47) The design team for a 15,000 sqft retail store wishes to increase ventilation to improve indoor air quality. What is a likely drawback of this decision?
Decreased occupant comfort
Increased carbon dioxide concentrations
Increased energy use
Increased impact from Environmental Tobacco Smoke
48) A project team wants to earn as many points in Materials and Resources as possible. Which of the following strategies will help this goal? (Select 3)
Acquiring as many materials from within 100 miles
Diverting all soil away from the landfill
Installing only materials that have high recycled content
Using new wood certified from the Forest Stewardship Council
49) The LEED rating systems Project Check List allows a project team to:
Complete a press release concerning key achievements of their project with regard to LEED certification
Earn pre-certification based on a projected achievement of credits
Set a goal for a level of certification early on in the project
Submit required documentation to local code review to start LEED certification process.
50) Renewable energy can: (select 3)
Increase energy efficiency
Increase the nation's dependence on imported fuels
Protect human health and the health of the environment
Provide a backup for power outages
51) The Integrative Process credit includes three phases that project teams must complete. The three main phases include: (select 3)
Design and construction
Discovery
Occupancy, operations, and performance feedback
Systems Thinking
52) LEED Project Registration provides which of the following? (Select 2)
access to online LEED Credit Templates for the project
establishment of contact between the USGBC and the designated project contact
one point towards LEED Certification for registration before schematic design
three Credit Interpretation Rulings
53) . Components of the building envelope that would be included in the energy model (select 3)
Roof
Trim
Water closets
Windows
54) The intention to protect installed and on-site absorptive material, such as gypsum board, is to prevent:
Fluctuations in temperatures in the building
Moisture damage
Other contractors using the material
Sunlight damage
55) Is a LEED AP on the project team required to register the project on LEED-Online?
No, but the project would earn one point for having a LEED AP as a primary member of the project team
No, but using a LEED AP would reduce the registration fee
Yes, but the LEED AP can be from a subcontractor
Yes, but the LEED AP must be a primary member of the project team
56) Which of the following would not help increase the open space on a site?
Install a green roof in an urban area.
Minimize the building's footprint.
Plant only native plants.
Reduce the parking lot size of an urban site to allow space for a hardscaped courtyard.
57) If there is a designated smoking area outside the building it must be at least 25 feet away from the building's _________(select 3)
Entries
Operable windows
Outdoor air intakes
Sitting area outside for building occupants
58) To achieve the Location and Transportation (LT) credit Bicycle Facilities for a new office building, the number of shower and changing facilities is determined by the following:
For projects with 10 or fewer occupants, no shower is required.
For projects with 100 or fewer regular building occupants, no shower is required
For projects with 100 or fewer regular building occupants, only one shower is required
For projects with more than 100 regular building occupants, only one shower is required
59) When is it acceptable to use the USGBC member logo?
Anyone can use the USGBC member log
For use by a member of a local USGBC chapter
For use only with a company that is a national USGBC member
For use with a material that contributes to LEED projects
60) An existing building on a campus will be renovated. The building will only be repainted and some light fixtures will be replaced. Which LEED rating system adaptation would you use?
LEED BD+C: Core and Shell
LEED BD+C: New Construction
LEED ID+C: Commercial Interiors
LEED O+M: Existing Buildings
61) To achieve the Rainwater Management credit, project teams must determine the runoff from each type of land cover. What is the correct volumetric calculation?
Runoff = Depression storage - Rainfall - Infiltration loss
Runoff = Infiltration loss + Depression storage - Rainfall
Runoff = Rainfall - Depression storage - Infiltration loss
Runoff = Rainfall - Infiltration loss + Depression storage
62) How is the total percentage of construction waste diverted from the landfill calculated?
(landfill waste + recycled waste) / by recycled waste
63) What is the main standard used to define the baseline per flush and flow rates for the water efficiency of fixtures used in the interior of the building?
ASHRAE 90.1-2007
Energy Policy Act (EPAct) of 1992
Local codes
WaterSense minimum standards
64) Which of the following statements are true of LEED? (Select 3)
All prerequisites are required based on the Rating System Adaptation.
Credits within each category offer potential project points, which determine the LEED Certification level
LEED Categories differ depending on the Rating System.
Registration is awarded when a project completes all LEED prerequisites.
65) An office employee can be included in the count of building occupants that has control over her own thermal comfort in which scenario ?
She has a desk in an open-floor cubicle office and shares a thermostat with 6 other workers
She has a private office with a thermostat on the wall
She has an individual vent under her desk which she can open and close
She teaches in a classroom in a wing of the school that is controlled by one thermostat setting
66) What is NOT a correct statement about LEED BD+C: Schools? (Select 2)
K-12 projects can utilize either LEED BD+C: Schools or LEED BD+C: New Construction rating system adaptations
LEED BD+C: Schools addresses issues such as classroom acoustics, master planning, and mold prevention
LEED BD+C: Schools is based on the LEED BD+C: New Construction rating system adaptation
LEED BD+C: Schools recognizes the unique nature of the design and construction of K-12 schools
67) What is water lost through plants plus water evaporated from the soil?
Evapotranspiration
Evapotranspiration Rate
Leakage Rate
Water Loss Coefficient
68) LEED projects are required to share whole-project water usage data for how long?
1 year, unless prohibited by national laws
20 or fewer years, depending on LEED certification level.
5 years, or until the building changes ownership
5 years, unless prohibited by national laws
69) LEED addresses refrigerants so that which of the following is not implemented, or is phased out of a building's HVAC&R equipment?
Chlorofluorocarbons
Global warming potential
Hydrochlorofluorocarbons
Ozone depleting potential
70) A new 30-story commercial office building is being located in the downtown core of Seattle, WA. Prior to development, the site was listed by the EPA National Priorities List as a Superfund site. What strategies might be most appropriate for the project based on these characteristics?
High Priority Site, Low-Emitting Materials, and Indoor Air Quality Assessment
Light Pollution Reduction, Indoor Air Quality Assessment, and Site Assessment
Low-Emitting Materials, Light Pollution Reduction, and Sensitive Land Protection
Sensitive Land Protection, Surrounding Density and Diverse Uses, and High Priority Site
71) What credits use a baseline to perform calculations? (Select 2)
Daylight
Heat Island Reduction
Optimize Energy Performance
Outdoor Water Use Reduction
72) What statements about the LEED process are true? (Select 2)
Appeals can only be made after the full application review.
If adequate points are achieved, certification can be awarded at the completion of the Design Phase Submittal
If the execution of a design phase credit changes during construction, it must be resubmitted during the Construction Phase Submittal
No Credits are awarded during the Design Phase Submittal
73) How long must a building be fully occupied before it is eligible for LEED Existing Building certification?
12 months
18 months
24 months
6 months
74) What can a project team do when a credit is denied by a LEED reviewer after a final construction review?
Appeal the ruling and provide documentation to support the appeal
Nothing. All results are final.
Revise the project so it complies and resubmit the final construction review
Submit a Credit Interpretation Request (CIR) to overturn the reviewer's ruling
75) What is required when performing calculations for Outdoor Water Use Reduction?
Full Time Equivalents
Municipal water rates
Solar Reflectance Index
Species Factor
76) A commercial project is at the construction documents stage when the owner decides to add an indoor smoking lounge on the first floor. Which of the following is accurate?
Smoking rooms are allowed if sufficient provisions are in place to protect adjacent spaces.
The project does not require special considerations for the indoor smoking area.
The project may earn exemplary performance for Environmental Tobacco Smoke Control
The project must choose between LEED and the indoor smoking room
77) A project encounters a unique technical condition not directly addressed by credit requirements in a LEED rating system. How should the project team proceed?
Call their designated LEED Project Manager at USGBC
Review LEED case studies to find how precedent has been established
Submit a credit interpretation request
Submit it as an Innovation in Design credit
78) A project is an in-fill location in the downtown of a large city on a previously developed site. The design team should consider which of the following? (select 2)
Limit areas of disturbance in accordance with Protect Habitat
Provide native/adaptive vegetation in accordance with Restore Habitat
Use a combination of strategies (green roof, open-grid paving, and vegetated strips) to improve stormwater quality
Work with existing flow patterns of the site to control the rate of stormwater run-off
79) Performing a Site Assessment before conceptual design can help achieve all of the following EXCEPT:
Increased participation in vehicle sharing services
Reduced cost for renewable energy systems
Reduced life-cycle impacts from the building
Reduced risk
80) The BUG system used for the Light Pollution Reduction credit is comprised of what three parts?
Backlight, under light, glow
Backlight, uplight, glare
Ballast, underexposure, glare
Beam angle, uplight, glare
81) The project team is looking to life cycle cost analysis as a method for evaluating alternative flooring products. Which of the following should they take into consideration as inputs for the analysis? (Select 2)
first costs, excluding the cost of installation
first costs, including the cost of installation
maintenance and replacement cost, but not life expectancy
maintenance, life expectancy, and replacement cost
82) Which of the following is an acceptable product reference to LEED?
Greenwood chairs are FSC certified, and contribute to LEED credits
Greenwood chairs are LEED certified
Greenwood chairs are LEED products
Greenwood chairs qualify for 2 points in LEED due to FSC construction
83) Which of the following are considered diverse uses for development density and community connectivity: (Select 3)
Drive-through coffee stand
Gas station
Hardware
Museum
84) Which materials below are mandatory for collection and storage of recyclables? (select 3)
Corrugated cardboard
Glass
Light bulbs
Plastic
85) Question 94
Location and Transportation (LT) credit Reduced Parking Footprint is achieved by providing parking capacity that is a percentage reduction below the base ratios recommended by:
National Parking Association
The Parking Consultants Council
The Parking Engineers Council
86) Which two are not accounted for in Thermal Comfort as determined by ASHRAE Standard 55-2010? (Select 2)
air movement
daylight
humidity
ventilation effectiveness
87) Which of the following would be considered a soft cost?
Environmental Consultant Fees
The cost of a building HVAC system
The cost of a product, including operations and maintenance
The cost of all new wood products
88) To achieve LT Credit Sensitive Land Protection, which site CAN a project develop on:
Land that has threatened or endangered species
Previously developed site that is 10 feet above the elevations of the 100-year flood as defined by FEMA
Previously undeveloped land this is within 50 feet of a body of water
Prime farmland as defined by USDA
89) Which of the following sites qualify as a High Priority Site for LEED? (Select 3):
Difficult development area as defined by US Housing and Urban Development
Federal Empowerment Zone
Federal Environmental Community
Infill location in a historic district
90) Which of the following is NOT true for the MR credit option Material Ingredient Optimization?
products must constitute at least 25%, by cost, of the total value of permanently installed products in the project
products using the GreenScreen path can contain chemical ingredients with Benchmark 1 hazards, as long as the ingredients are disclosed to 100 ppm (0.01%)
qualifying products include those with certain levels of Cradle to Cradle certification
the REACH Optimization path is only allowed for projects outside of the United States
91) The concept of Albedo relates to what LEED credit?
Enhanced Refrigerant Management
Heat Island Reduction
Light Pollution Reduction
Low-Emitting Materials
92) LEED uses a referenced standard to determine if a vehicle is considered green. Which organization publishes the annual vehicle ratings used by LEED?
American Council for Electric Vehicles Guide
American Council for an Energy Efficient Economy (ACEEE)
Federal Electric Power Systems Manual (FEPS)
National Council for Green Vehicles Manual (NCGVM)
93) Which of the following statements are true (select 2)
CFC's are naturally occurring
Existing systems are exempt from the prerequisite
Fundamental Refrigerant Management is most concerned with global warming
Fundamental Refrigerant Management is most concerned with ozone depletion
94) Which of the following would be factors that would encourage a project to undergo air quality testing instead of a flush-out: (select 2)
Ambient humidity is near zero and temperatures are between 60F and 80F (15C and 27C)
Ambient levels of CO2 are 9.3 ppm
Construction is behind schedule, and future tenants are ready to move in immediately
The projected LEED certification level is teetering between silver and gold
95) Minimizing a project's parking lot would (select 2):
Encourage carpooling.
Help reduce the quantity of stormwater run-off
Increase building energy consumption.
Mitigate brownfield contamination.
96) Who may submit a Credit Interpretation Ruling (CIR)?
Members of a project pursuing denied credit appeal
Registered LEED project administrator
USGBC members
Workshop attendees
97) ASHRAE standard 90.1-2010 is primarily concerned with which of the following?
energy consumption
lighting design
ozone depletion
ventilation effectiveness
98) In working on Light Pollution Reduction, all of the following are required for exterior lighting except?
Emittance of the parking lot paving material
Light directed off the site
Light directed upward to the sky
Lighting zone classification
99) Which of the following is NOT a requirement for a whole building life-cycle assessment, as referenced in the MR credit Building Life-Cycle Impact Reduction?
LCA must include products related to excavation and other site development
proposed building(s) must demonstrate at least 10% reduction in Global Warming Potential compared with baseline building
scope of LCA must be cradle to grave
service life of building must be at least 60 years
100) Which of the following is not a natural refrigerant?
Ammonia
Carbon Dioxide
Hydrofluorocarbon
Water
Access options
Get online access or buy a physical book.
Option 1: Online access
Unlock the answers to 100 questions for just $19.99
You'll get immediate access after payment.
Step 1
Enter the email address where you want us to send your order to.