1) What steps would be included in the pre-design phase of a green building project? (Choose 2)
Develop a project schedule
Develop, test, and select green systems
Review laws and standards
Review material's test data
2) A floor covering that can be recycled into a new product at the end of its useful life would be what type of product?
Cradle to cradle
Cradle to grave
Passive
Renewable
3) Which of the following can happen as a result of increased rainwater runoff?
Decreased energy performance
Eutrophication
Increased heat islands
Increased potable water use
4) What would be the direct result of specifying more costly, high-performance windows during the Construction phase?
Decreased overall project costs
Increased building costs
Inexpensive downsizing of the HVAC system
Less energy consumed by the building
5) A business owner wants to have an open office plan in a tenant space. To increase daylighting and optimize views, which of the following should the plan include?(Choose 2)
Single-pane glazing
Solid doors
Task lighting
Vision panels
6) What is NOT true about a closed system in the built environment?
All aspects of a closed ecosystem are highly integrated to ensure maximum efficiency
Materials in a closed system are used for other purposes at the end of their useful life
There is no waste
Used resources are released outside the system
7) Which of the following actions can a project team take to help manage runoff on-site in a dense urban area?(Choose 2)
Design all parking under the building
Harvest rainwater
Increase the size of the drainage pipes
Install a green roof
8) What are some of the economic benefits of green building?(Choose 2)
Increasing the tax base to the community
Reduced disturbance of greenfield sites
Reduced liabilities due to poor indoor air quality causing health issues
Reduced utility costs
9) Which refrigerants are considered environmentally benign?(Choose 2)
Halons
HydroFluoroCarbons
Hydrocarbons
Propane
10) A project team will provide outdoor space to encourage occupant health and activity. Which of the following are examples of quality open space?(Choose 2)
A jogging trail
An artificial turf for an outdoor soccer field
Garden space dedicated to community gardens
Small strips of turf in parking lots
11) What LEED rating system helps create better, more sustainable, well-connected neighborhoods?
LEED BD+C: Schools
LEED Homes
LEED ND
LEED O+M: Existing Buildings
12) Which of the following is one of the tasks that integrative project team members complete together?
Applying for financing
Energy modeling
Identifying opportunities for synergy
Select a target certification level
13) Which of the following is an alternative compliance path to the International Green Construction Code (IgCC)?
ASHRAE 189.1
ASHRAE 90.1
BREEAM
LEED
14) Which of the following is NOT an example of on-site generated renewable energy?
Biofuel-based electrical system
Renewable Energy Credits (RECs)
Solar
Wind
15) What helps a project take advantage of the environmental assets of the area they live in?
Local building code
Minimum Program Requirements
Prerequisites
Regional Priority credits
16) Designers and builders can construct green buildings that use significantly less municipal water than conventional construction by performing which of the following actions?(Choose 3)
Decreasing the number of fixtures in a project
Incorporating native landscapes that eliminate the need for irrigation
Installing water-efficient fixtures
Reducing the site's runoff volume
17) What is the most likely reason that a LEED project incurred higher development costs compared to conventional development?
Green building goals were not set in the pre-design phase
Material costs rose
New, green building technologies were used
Team members worked together instead of separately
18) A building owner of a new extended-stay hotel is concerned about the higher initial costs for ENERGY STAR appliances. Which of the following could help with the decision-making process?
A life cycle costing of the trade-offs between the capital and operating costs
Reviewing the building's energy use for ways to improve efficiency
Showing the GHG emissions that would be reduced
Using computer modeling to prioritize the owner's project requirements
19) What accounting methodology is used to evaluate the economic performance of a product or system over its useful life?
Cradle-to-cradle
Life cycle assessmen
Life cycle costing
Triple bottom line accounting
20) The point values of a credit are based on the credit's ability to:(Choose 2)
Contribute to a higher certification level
Decrease building costs
Mitigate the environmental harms of a building
Promote beneficial effects
21) How would the distance from a building's entrance to the nearest bus stop be measured?
By calculating the street and/or bicycle network distance
By calculating the walking distance along infrastructure that is safe and comfortable for pedestrians
By determining the straight-line radius from point to point.
By determining the street network distance, excluding private drives
22) At which point during the project schedule would a flush-out occur?
After HVAC ducts have been sealed and protected
After the building envelope is weather-tight
Prior to occupants moving in
Prior to the building water being turned on
23) Green Seal and Environmental Choice are third party standards for what products?
Cleaning products
Electronic equipment
Flooring
Furniture
24) What is a brownfield?
A site that has been graded
An infill site
Gaps between existing infrastructure
Previously used or redeveloped land that may be contaminated with hazardous waste or pollution
25) A material that has met which of the following standards would contribute to material ingredient optimization?(Choose 2)
Cradle-to-Cradle Certified
Global Reporting Initiative
GreenScreen
Health Product Declaration
26) What standard can assist project teams with engaging in a comprehensive integrative process?
ENERGY STAR
I-Codes
ICC
Integrative Process (IP) ANSI Consensus National Standard Guide 2.0 for Design and Construction of Sustainable Buildings and Communities
27) Commissioning of a building is intended to verify the building and its systems meet which of the following:
HVAC specifications
Local building code
Occupant preferences
The owner's project requirements
28) Which of the following materials can be certified under the Forest Stewardship Council (FSC)?(Choose 3)
Bamboo floors
Hardwood cabinets
Leather furniture
Softwood molding
29) A school building consumes electricity from the grid at night while contributing energy back to the grid during the day from on-site solar panels, resulting in the school having no electricity costs. This is an example of:
Carbon neutrality
Net-zero energy
Water balance
Zero waste
30) Where should a project team go for updates and errata for the LEED BD+C: New Construction rating system?
GBCI.org
LEED online
LEED reference guides
usgbc.org
31) What does the use of light-colored, pervious paving help with?(Choose 2)
Habitat conservation
Heat island reduction
Open space
Rainwater management
32) Which percentage of the Earth's water is fresh water?
10%
3%
5%
7%
33) If a project owner locates a building close to a bicycle network, which of the following project elements could decrease?
Parking
Rainwater runoff
Surrounding density
The number of diverse uses
34) Which factors affect an occupant's thermal comfort?
Acoustics, ergonomics, and views
Daylighting, air monitoring, and cleanliness
Temperature, humidity, and air movement
VOC levels, glare, and acoustics
35) Which of the following is aided by locating a project within a dense area?
Increased diversity
Preserving historic districts
Promoting vehicles with alternative fuels
Promoting walkability
36) A new building tenant is leasing 2-stories in an existing 10-story building. What rating system would be appropriate for the project?
LEED Building Design and Construction: Core and Shell
LEED Building Design and Construction: New Construction
LEED Interior Design and Construction: Commercial Interiors
LEED Operations and Maintenance: Existing Buildings
37) An additional cost that a green building project may have compared to a conventional project is:
Added utility costs
Consultant fees for green building experts
Increased prices for selecting a sustainable site
Permit fees for plumbing
38) What is a strategy for construction activity pollution prevention that would prevent waterway sedimentation?
Increasing soil compaction
Protecting on-site materials
Providing natural buffers around the property
Reducing fertilization
39) Which of the following actions should a project team take to make sure a building remains efficient during its operation?
Ensure that the building systems are functioning as designed and that they support the owner's project requirements
Run computer simulations to prioritize energy-efficiency opportunities
Turn on all systems to their maximum output to confirm the building can handle the load
Verify that no issues occur during a demand-response event
40) What project areas would you find CFCs used in?(Choose 2)
Centrifugal chillers
Hot water heating
Radiant flooring
Refrigeration
41) Regularly occupied spaces would include which of the following:
Break room
Corridor
Dorm room
Restroom
42) What is a benefit of increasing the quantity of open space on a project?(Choose 2)
Increased durability of the overall project
Increasing rainwater infiltration
More habitat for vegetation and wildlife
Reducing potable water use
43) What is true if a building code official finds an issue between a proposed energy efficiency strategy and the city's building electrical code?
A LEED reviewer must approve the existing strategy
The electrical contractor can proceed with the design
The project administrator should re-run the energy model
The project team must alter the design
44) Which of the following are sources of graywater?(Choose 2)
Municipal potable water supply systems
Showers
Toilets
Washing machines
45) Which of the following occupants would be classified as an FTE?
A full-time cafeteria worker
A full-time telecommuter
A museum visitor
A part-time salesman
46) What statement is true regarding ChloroFluoroCarbons (CFCs) and HydroChloroFluoroCarbons (HCFCs)?
CFCs are being phased-out under the Montreal Protocol while HCFCs are banned under the Montreal Protocol
CFCs have a greater global warming potential (GWP) than HCFCs
LEED encourages replacing CFC or halon-based fire suppression systems with HCFCs
The ozone depletion potential (ODP) of HCFCs and CFCs is about the same
47) When there are two or more rating systems that might be applicable to a project, how should the project team decide which rating system to use?
Check with local code what rating system to use
Choose the rating system that has the most regional priority credits
Choose the rating system that will result in the lowest certification costs
Use the 40/60 rule
48) What is NOT a principle that should be followed for a successful green building project?
Budgeting the planning and design costs separately from the operations costs
Committing to green building early in the process
Looking at long term savings
Multidisciplinary approach
49) Which of the following identifies the biggest difference in the integrative process compared to a conventional building process?
The integrative process has a completion date.
The integrative process includes a schematic design phase.
The integrative process involves all project team members.
The integrative process is iterative.
50) What low / no cost structural incentive can a municipality make to a developer to encourage green building?
Allowing increases in the floor area ratio
Fee waivers
Green building grants
Tax credits
51) At a minimum, a project team must successfully do which of the following to obtain LEED certification?(Choose 2)
Gather documentation for 40 of the points available
Gather documentation for the prerequisites
Hire a LEED AP
Record all vendors used on the project
52) A large home builder is developing a new neighborhood with 200 homes. What strategies would help the builder save on material costs and conserve materials?(Choose 3)
Choose products made in factories that support worker health
Reducing hallways
Select products that ship with less packaging
Structural insulated panels
53) The developer of a school project in a sunny region suggests using light shelves to bring daylight into some of the classrooms. Which of the following issues would arise as a result of this strategy?
Decreased acoustic performance
Glare reduction
Interference with outside views
Reduction of low-emitting materials
54) Why should a building have a green cleaning policy?
To decrease the time it takes to clean a building
To provide the janitorial staff with an opportunity to be part of the integrative design
To reduce the costs of cleaning a building
To reduce the environmental effects of cleaning products
55) A construction waste management plan should address what items?
A community recycling program and source reduction
A target diversion rate and what materials should be diverted from the waste stream
The disposal of hazardous materials and corporate sustainability reporting
Where onsite waste can be incinerated and where certified wood can be procured
56) Protecting human health globally and across the entire built environment life cycle is part of what impact category?
Create a Strong Sense of Place
Enhance Individual Human Health and Well-Being
Promote Innovation and Integration of Green Building Products and Services
Sustainable Use and Management of Ecosystem Services
57) What is the maximum number of project administrators that can be assigned to a LEED project?
1
2
3
Unlimited
58) Exemplary performance and pilot credits are awarded in what LEED category?
Awareness and education
Core and Shell
Innovation
Sustainable Sites
59) What is USGBC's vision?
Buildings and communities that will regenerate and sustain the health and vitality of all life within a generation
Lead and accelerate the transformation to high-performing, healthy green buildings, homes, and communities throughout the United States
See the transformation of a built environment that leads to a sustainable future
Transform the way buildings and communities are designed, built, and operated
60) For which of the following reasons is it important to conduct occupant surveys?
Surveys are a Minimum Program Requirement.
Surveys are required for ongoing commissioning.
Surveys identify areas that need improvement.
Surveys reduce the ongoing waste stream.
61) For which of the following are the ICC International Codes used?
Defining minimum indoor air quality standards
Establishing energy-efficiency guidelines for public buildings
Guiding code officials about hazardous chemicals contained in building materials
Providing minimum safeguards for people at home, at school, and in the workplace
62) Which of the following exemplify strategies of reducing harm to the environment over a building's entire life?(Choose 3)
Conducting a life-cycle assessment to help reduce a building's environmental footprint
Restoring a historic building
Tearing down a building and putting up a more energy-efficient one in its place
Using salvaged flooring in a new building
63) Which design strategy allows occupants to actively participate in energy savings?
Daylighting
Smoking away from the building
Task lighting
Views to the outdoors
64) What minimum contract length is required for an owner to purchase renewable energy certificates (RECs) for LEED credit?
1 year
10 years
3 years
5 years
65) What must be considered in the project budget for a green building project that would not be part of a conventional project?
Added building equipment to make the building more energy efficient
Additional time in the schedule for construction
Contingencies for research of unconventional techniques or materials
Selecting only ENERGY STAR appliances
66) What can be used to compare the energy performance of two buildings?
ENERGY STAR
Green-e
LEED
LEED Online
67) WaterSense labels apply to what products? (Choose 3)
Irrigation submeters
Private lavatory faucets
Showerheads
Toilets
Access options
Get online access or buy a physical book.
Option 1: Online access
Unlock the answers to 67 questions for just $9.99
You'll get immediate access after payment.
Step 1
Enter the email address where you want us to send your order to.